Showing posts with label World Cup F2B. Show all posts
Showing posts with label World Cup F2B. Show all posts
Saturday, April 4, 2020
Saturday, July 28, 2018
Saturday, October 21, 2017
world Championship 2018
The well-known control line stadium in Landres in the east of France will receive these world championships, as it did in 2000 and 2008.
Every year the club organize on this stadium the Netherlands and French Grand Prix, which are World Cup events. This site is totally ready to receive such a world event.
Every year the club organize on this stadium the Netherlands and French Grand Prix, which are World Cup events. This site is totally ready to receive such a world event.
Permanent circles for F2A /F2B/F2C and F2D exist, with permanent score displays (F2A and F2C). Training will be organised on the spot for F2A and F2C, and on football places in the town of:
- Piennes (2km)
- Mercy le Bas (6km).
תוויות:
aero Club,
amit shani,
Brodak,
control line,
discovery-aeromodels,
f2a,
f2b,
f2c,
f2d,
FAI,
Igor Burger,
windy,
World Cup F2B,
Yatsenko
Saturday, March 18, 2017
Monday, October 31, 2016
An amazing person - Amit Shani.
תוויות:
aero Club,
amit shani,
control line,
f2,
f2b,
FAI,
flight,
Paul Walker,
rcmodel,
windy,
World Cup F2B,
Yatsenko,
טיסני כבלים,
טיסנים,
עמית שני,
קלוב תעופה
Wednesday, October 26, 2016
Finish Wing
תוויות:
control line,
diy,
f2b,
Finish Wing,
World Cup F2B,
טיסני כבלים,
טיסנים
Monday, October 17, 2016
The process of building a wing
The process of building a wing
*Post updated course of work*
I chose this profile Profiles Template
![]() |
Profiles Template |
Preparation of profiles:
Then use a new method to create a very good profile.
and cutting aluminum for profiles template.
For profiles I've used with balsa 1.5mm
Location profiles in the mold
13 profiles for each side
Unfortunately no pictures of the process of refinishing and cutting of profiles...
----------
After refinishing of profiles.
Final result.
In conclusion:
I highly recommend this method of preparation of the the profiles only if your profile is symmetrical,
Because it is very accurate and easy to work
I think the most correct method creates a profile symmetrically equal on both sides.
wing:
Placing the profiles and test measurements.
Continued work and testing before gluing.
Placing beam and flow edge.
Continue work on the wing.
I chose a steering axis of sig.
Closing a box structure.
Wing tip:
Fnish:
תוויות:
aero Club,
Brodak,
control line,
discovery-aeromodels,
diy,
dvir bason,
f2b,
FAI,
rc control,
The process of building a wing,
windy,
World Cup F2B,
Yatsenko,
טיסני כבלים,
טיסנים
Monday, October 10, 2016
Steering axis:
תוויות:
aero Club,
diy,
f2b,
I chose a steering axis of sig,
Paul Walker,
sig,
World Cup F2B,
טיסני כבלים,
טיסנים,
משלוש,
ציר היגוי
Sunday, October 9, 2016
Subscribe to:
Posts (Atom)